Here is the new revised schedule written by Sandy:

Week 7 13-03-08
Team: Final designs for graphics decided.
Will: Game mechanics tweaked inline with what appeared in testing.
Sandy: Make up list of all assets needed for game.
Alan: Write brief and basic back story.

Week 8 20-03-08
Team: Brainstorm and develop back story.
Will: Design of graphics allocated from assets.
Sandy: Design of graphics allocated from assets.
Alan: Storyboard cut scenes.

Currently we're slightly behind. Other weeks to follow!